bord and pillar

Room and Pillar Mining Method

Oct 22, 2014· Room (Bord)-and-Pillar Layout Figure shows Room and Pillar Mining 6 Underground mining: room-and-pillar mining of thick seams -“Benching” Different approaches allow either the top or bottom part of the seam to be mined out first Note: the “hangingwall” is above the mining cavity, and the “footwall” is below it.

24/7 online

will no longer build tracked drills, bord and pillar

will no longer build tracked drills, bord and pillar mining machinery , where room and pillar products are produced, and 40 workers in Denison, Texas where track drills are manufactured.

24/7 online

Bord & Pillar Method

Basic parameters of bord and pillar mining system 1 Gallery (bord) 2 Pillar 3 Junction Calculation of percentage of extraction during development If coal from the full seam thickness is extracted, the percentage of extraction during development is nearly 20% in deep mines and 35% in shallow min.

24/7 online

Non-Electric Delay Detonato

is a leading supplier of Non-Electric Delay Detonato that is suited for a range of applications namely but not limited to Bord and pillar,Tunneling,Sequential blasting in underground stoping,Quarry applications,Construction blasts,Commonly used in ‘air blast’ sensitive areas as it is considered ‘noiseless’,Blasting of open pit operations,Underground stoping,,Underground.

24/7 online

Room-and-pillar mining

Other articles where Room-and-pillar mining is discussed: mining: Room-and-pillar mining: The most common mining system is room-and-pillar In this system a series of parallel drifts are driven, with connections made between these drifts at regular intervals When the distance between connecting drifts is the same as that between the parallel drifts, then a.

24/7 online

Bord and Pillar Methods

Books and Papers, Reviewed or For Sale, Items For Sale The Message Board The Bathrooms.

24/7 online

Bord & Pillar

Bord & Pillar, Roslyn, Washington 8 lik Welcome to Bord & Pillar! A specialty food store in the beautiful log cabin just outside historic Roslyn, WA.

24/7 online

Bord & Pillar Pet Resort (@bordandpillar) • Instagram

Bord & Pillar Pet Resort Pet Spa located in Roslyn Wa Luxurious spa treatments, daycare and boarding for your fur-babi Home and Pet boutique, and wine tastings on site bordandpillar.

24/7 online

BORD AND PILLAR METHODpptx

View Test Prep - BORD AND PILLAR METHODpptx from ENG 286 at Davidson College Under Ground Mining Board and Pillar Method Branch : Mining and Min Surveying Engg Presentation By :.

24/7 online

Mining Funda: Bord and Pillar method of Mining

Bord and pillar mining method comprises two phases ie DEVELOPMENT and DEPILLARING Sometimes both these phases proceeds simultaneously In development, pillars are formed by driving a network of galleries, of which one set is generally parallel to the dip and the other set is parallel to the strike cutting the former at right angl.

24/7 online

Non-Electric Delay Detonato

is a leading supplier of Non-Electric Delay Detonato that is suited for a range of applications namely but not limited to Bord and pillar,Tunneling,Sequential blasting in underground stoping,Quarry applications,Construction blasts,Commonly used in ‘air blast’ sensitive areas as it is considered ‘noiseless’,Blasting of open pit operations,Underground stoping,,Underground.

24/7 online

Bord dictionary definition

bord definition: Noun 1 Obsolete form of board [11th-17th c] 2 Obsolete form of bourd [14th-17th c] Noun (plural bords) 3 , In the former, which is also known as " post and stall" or "bord and pillar " in the north of England, " pillar and stall " in South Wales, and " stoop and room " in Scotland.

24/7 online

Bord and Pillar

The term bord and pillar is of north of England origin, the system of working being known in other districts as "stoop and room" (Scotland), "pillar and stall" (Midlands), and sometimes merely as "narrow work" "Bord" is an old Saxon word for road.

24/7 online

Bord & Pillar Pet Resort (@bordandpillar) • Instagram

Bord & Pillar Pet Resort Pet Spa located in Roslyn Wa Luxurious spa treatments, daycare and boarding for your fur-babi Home and Pet boutique, and wine tastings on site bordandpillar.

24/7 online

Bord and Pillar Coal Cutting Machine ~ Mining

Jan 22, 2014· Coal cutting machine is used in bord and pillar mining method of underground coal mining to make Undercut, Overcut or Middlecut to provide free face for the blasting operation Development by CCM: The headings are Undercut, Overcut or Middle Cut by a coal cutting machine and shot holes are then drilled and charged with explosives and blasted.

24/7 online

Pillar design incoalmines

Fig 3-Potential areas of application of bord-and-pillar mining It should be noted that both bounds are controlled largely by economic factors For the most severe con-straints, namely acoal-to-waste ratio of1:10 and an upper limit for lost coal of30per cent, the field of application ofconventional bord-and-pillar.

24/7 online

Environmental impacts associated with an abandoned mine in

Bord and pillar mining started in 1908 The average pillar size left behind was 6×6 m and the average bord width was 7 m, so the extraction ratio was approximately 60% The average mining depth was in the region of 18-20 m, with a mining height of 25 m.

24/7 online

Cutting and bolting tools

Cutting and bolting tools offers a broad range of tool systems for machines such as coal shearers, continuous miners and roadheaders, bolter miners and drill rigs , offers a wide range of extremely productive and reliable continuous miner cutting tools for bord and pillar mining.

24/7 online

Toward Pillar Design to Prevent Collapse of Room-and

TOWARD PILLAR DESIGN TO PREVENT COLLAPSE OF ROOM-AND-PILLAR MINES R Karl Zipf, Jr Chief, Catastrophic Failure Detection and Prevention Branch NIOSH

Definition of bord-and-pillar method A system of mining in which the distinguishing feature is the winning of less than 50% coal on the first working It is more an extension of the development work than mining The second working is similar in principle to top slicing The remainder of the coal is won by a retreating system, the cover being.

24/7 online

Environmental impacts associated with an abandoned mine in

Bord and pillar mining started in 1908 The average pillar size left behind was 6×6 m and the average bord width was 7 m, so the extraction ratio was approximately 60% The average mining depth was in the region of 18-20 m, with a mining height of 25 m.

24/7 online

Bord and Pillar Methods

Books and Papers, Reviewed or For Sale, Items For Sale The Message Board The Bathrooms.

24/7 online

Kajora Area

19 Parascole East & Parascole West UG mine, with peak annual capacity of 039 mt, is expected to have a life of over 25 years As of 2015-16, the mine was working Jambad seam (R-VIII) by the bord and pillar method with stowing, manually in the top section and by SDL in the bottom section.

24/7 online